What Went Wrong

Required on every Brief, and free to read. The failure log is the trust mechanism.

Last checked 2026-09-11

Every Brief has to have one. A trip with nothing that went wrong is a trip nobody looked at closely.

Each entry works best as three parts: what you assumed, what actually happened, what it cost you in money or time.

Weak entryThe weather was unpredictable and we had to change plans.
Strong entryAssumed the pass was open from 1 June. It opened on the 19th. Two nights in Omalo we had not budgeted, 120 GEL, and we lost the second valley entirely.

Read next

Still stuck? Email wildboxapps@gmail.com. Tell us the file or the place and we will get to it.